U-curve

From Pearl Language
Revision as of 11:00, 19 February 2014 by Martien (talk | contribs) (Oyster)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

…a heap of work, like a Template:Pal or story map.

✣  ✣  ✣

Determine the optimum sprint length or batch size.

A sprint effectively is a small batch of work that you pull in and get done. Smaller batches make you more nimble and flexible, and reduce risk, yet come at the cost of splitting (‘transaction costs’). So, use the story splitter with care—ka-ching a day makes product owner hurray.

Therefore:

Find the sweet spot for best batch sizes by balancing the holding cost with the economy of scale.

✣  ✣  ✣



✣  ✣  ✣

Sources